Diamond Member Pelican Press 0 Posted August 11, 2024 Diamond Member Share Posted August 11, 2024 This is the hidden content, please Sign In or Sign Up California dam raise would take more Delta water. Why are environmentalists silent? Fresno drivers headed to the Bay Area via Pacheco Pass on Highway 152 can’t help but take note of a sprawling inland sea that seemingly appears out of nowhere among the yellowed, oak-dotted foothills. This is San Luis Reservoir, essentially a 2 million acre-foot holding tank built to irrigate San Joaquin Valley farms and supply drinking water to Silicon Valley. Its construction was considered such a significant addition to California’s water supply that This is the hidden content, please Sign In or Sign Up turned out in 1962 to push the dynamite plunger. “It is a pleasure for me to come out here and help ***** up this Valley,” Kennedy This is the hidden content, please Sign In or Sign Up from a temporary grandstand erected atop a nearby hill. Six decades later, the 3½-mile long earth dam that towers above 152 and impounds the federally owned, state operated reservoir This is the hidden content, please Sign In or Sign Up . Construction crews are 2½ years into a $1.1 billion seismic upgrade of B.F. Sisk Dam that won’t be completed until 2031. Opinion Funded mainly by the 1978 Safety of Dams Act, the project will raise the 382-foot-tall dam by 10 feet and add additional safety features designed to ease concerns of widespread flooding if slumping were to occur during a major earthquake. (San Luis Reservoir ***** within This is the hidden content, please Sign In or Sign Up and is situated uphill from the nearby communities of Los Banos and Santa Nella.) So far, the 120 to 150 workers have focused This is the hidden content, please Sign In or Sign Up and raising three different stability berms along the dam’s midsection where seepage had been occurring. Most of the material required, millions of cubic yards worth of boulders, riprap and gravel, is excavated from an on-site quarry and transported to the dam via a steady procession of dump trucks operating 12 hours a day. Just by itself, the Sisk Dam safety modification project does not increase the reservoir’s capacity. To accomplish that, the Bureau of Reclamation and San Luis & Delta-Mendota Water Authority are teaming on a second 10-foot dam raise that would create an additional 130,000 acre feet of storage. Enlarging the reservoir is projected to cost an additional $1 billion. But because the 10-foot storage raise would take place concurrently with the 10-foot seismic raise, work that isn’t scheduled to begin until 2027, the partners have time to assemble a funding plan. The next public negotiations are Aug. 22-23 in Monterey. “We want to maximize the effort and minimize the expense,” said Henry Garcia, the Bureau of Reclamation’s construction manager. data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== Looking down from the top of the B.F. Sisk dam, heavy machinery is seen preparing the ground with O’Neill Forebay and Highway 152 seen in the background Thursday, Aug. 8, 2024 near Los Banos. Little scrutiny, zero opposition The expansion of San Luis Reservoir is a small part of a larger effort by the state and federal agencies to increase water storage. But unlike virtually every other dam project in California, this one was approved with little public scrutiny and zero opposition from environmentalists — even though the extra 130,000 acre feet of water would come out of the heavily scrutinized San Joaquin-Sacramento River Delta. Why is that? As with everything involving water and the environment in California, there are multiple factors at play. The first of those is overload. Ron Stork, policy director at Friends of the River, rattled off more than a half-dozen dam projects his Sacramento-based environmental group and others are rallying against. They include: Sites Reservoir, a 1.5 million acre-foot offstream storage site planned in Colusa County; the proposed 25-fold expansion of Pacheco Reservoir, just over the hill from San Luis and This is the hidden content, please Sign In or Sign Up via a tunnel that runs through Pacheco Pass; and most urgently of all, the Trump-administration plan to raise Shasta Dam, which would inundate protected salmon habitat on the McCloud River. With all that going on — in addition to the ongoing battle against the Delta tunnel — environmentalists are compelled to prioritize their efforts. And San Luis, a vital cog in the state’s conveyance system already in operation, ranks at the bottom. “Those other projects are taking out beautiful portions of ****’s green earth where San Luis Reservoir would essentially extend the bathtub ring around an existing 2 million acre-foot reservoir,” Stork said. “So, yeah, that’s not so good. But if you’re up to your neck in alligators, some alligators are more important than others.” data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw==data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== The foothills near the Basalt Day Use area is seen with the B.F. Sisk Dam in the background at San Luis Reservoir Thursday, Aug. 8, 2024 near Los Banos. O’Neill Forebay is the water body in the far background beyond the dam. data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw==data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== Henry Garcia, construction manager with the Bureau of Reclamation, stands on top of the B.F. Sisk Dam at San Luis Reservoir discussing the construction project which will raise the dam but impact traffic along Highway 152 over Pacheco Pass for years. Photographed Thursday, Aug. 8, 2024. ‘The least worst thing’ Osha Meserve, an environmental lawyer who is among the This is the hidden content, please Sign In or Sign Up to the This is the hidden content, please Sign In or Sign Up of Pacheco Reservoir by the Santa Clara Valley Water District, which receives drinking water from San Luis Reservoir, called the San Luis dam raise “the least worst thing” among all the storage projects currently planned in California. “There’s so many destructive water infrastructure projects being proposed right now that I think people are having to prioritize the ones that they believe are the most damaging to the environment and are the worst investments of public funds,” Meserve said. San Luis Reservoir doesn’t rise to that level, Meserve added, because one can argue the worst environmental damage occurred during its original construction. Also, the federal government is largely footing the bill. This embedded content is not available in your region. The fact that the 10-foot capacity raise and the 10-foot seismic raise were submitted as individual projects has also added to the general confusion. Despite that, mitigation measures included in the Sisk Dam Raise and Reservoir Expansion Project essentially mirror those submitted for the seismic work. On top of that, the public comment ******* occurred in August 2020 during the height of the pandemic. Only four letters not written by government agencies or water districts are included in the final Environmental Impact Report. Three were submitted from local farmers in support of more storage. “They did it in pieces so you can’t see the entire project, and they did that at a time when public input was spotty,” said Patricia Schifferle, director of the water consulting firm Pacific Advocates. “It was designed to make sure the public doesn’t comment. That was the intentional process.” Construction on the earth dam that contains the largest offstream reservoir in the ******* States will continue another seven years, at least. After which it’ll be structurally safer and 6.5% larger. data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw==data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== The B.F. Sisk Dam at San Luis Reservoir is seen as construction continues in the first of three phases to improve the dam just west of Los Banos Thursday, Aug. 8, 2024. data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw==data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== Henry Garcia, construction manager with the Bureau of Reclamation, points out the green vegetation below the B.F. Sisk Dam at San Luis Reservoir, evidence of toe drain seepage Thursday, Aug. 8, 2024. This is the hidden content, please Sign In or Sign Up #California #dam #raise #Delta #water #environmentalists #silent This is the hidden content, please Sign In or Sign Up This is the hidden content, please Sign In or Sign Up 0 Quote Link to comment https://hopzone.eu/forums/topic/96550-california-dam-raise-would-take-more-delta-water-why-are-environmentalists-silent/ Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.