Jump to content
  • Sign Up
×
×
  • Create New...

Recommended Posts

  • Diamond Member

SEA-ME-WE 4 doubles undersea capacity with optical link

Looking to meet the ever-growing demand for bandwidth and deliver more flexible, durable and cost-effective connectivity, the SEA-ME-WE 4 cable consortium has turned to Ciena to deploy advanced, coherent optics to double the capacity of the congested Asia-to-Europe route.

Operated by a consortium of 16 telecoms operators,

This is the hidden content, please
is a next-generation submarine cable system linking Southeast Asia to Europe via the Indian sub-continent and Middle East. Approximately 18,800km long, the cable connects Southeast Asia, the Middle East and Western Europe, in particular Singapore, Malaysia, Thailand, Bangladesh, India, Sri Lanka, Pakistan, ******* ***** Emirates, Saudi Arabia, Egypt, Italy, Tunisia, Algeria and France.

The project aims to take these regions to the forefront of global communication by significantly increasing the bandwidth and global connectivity of users along its route between Singapore and France. The cable system has been designed to provide interfaces for connection in between terminal stations at a number of locations.

The upgrade to the cable has seen Ciena’s

This is the hidden content, please
submarine network solution deployed to provide a capacity increase from 65Tbps to 122Tbps through the system.

With GeoMesh Extreme, and also using its 6500 Packet-Optical platform, Ciena said SEA-ME-WE 4 could maintain pace with voracious global demand for bandwidth, protect terabits of traffic and ensure optimal network availability. Additionally, its

This is the hidden content, please
coherent optics are said to help lower costs significantly by increasing the capacity per wave up to 450Gbps.

SEA-ME-WE 4 is also using Ciena’s Navigator Network Control Suite for real-time visibility into and control of network performance.

“Ciena’s cutting-edge technology is helping us in optimising the resources of the SEA-ME-WE 4 cable, thereby enhancing its capabilities to address evolving connectivity demands through enhancement in network capacity, flexibility and durability,” said SEA-ME-WE 4 consortium management committee chairman Sidheeque Machinal.

“This upgrade holds particular significance given the pivotal role of the SEA-ME-WE 4 cable system in driving digitalisation efforts across the diverse regions where the system is passing through,” Machinal added.

Ciena’s vice-president of global submarine solutions, Thomas Soerensen, said: “The Europe-to-Asia route, where SEA-ME-WE 4 is situated, is experiencing a major digitalisation push, resulting in extreme capacity demands. With [our] expertise in building critical submarine network infrastructure, we’re helping SEA-ME-WE 4 address rising capacity demands by making the switch to network architectures that adapt to leverage intelligence, scalability and programmability.”



This is the hidden content, please

#SEAMEWE #doubles #undersea #capacity #optical #link

This is the hidden content, please


Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Vote for the server

    To vote for this server you must login.

    Jim Carrey Flirting GIF

  • Recently Browsing   0 members

    • No registered users viewing this page.

Important Information

Privacy Notice: We utilize cookies to optimize your browsing experience and analyze website traffic. By consenting, you acknowledge and agree to our Cookie Policy, ensuring your privacy preferences are respected.