Jump to content
  • Sign Up
×
×
  • Create New...

[NASA] New Hardware for Future Artemis Moon Missions Arrive at NASA Kennedy


Recommended Posts

  • Diamond Member
This is the hidden content, please
On the left, the Canopee transport carrier containing the ********* Service Module for NASA’s Artemis III mission arrives at Port Canaveral in Florida, on Tuesday, Sept. 3, 2024, before completing the last leg of its journey to the agency’s Kennedy Space Center’s Neil A. Armstrong Operations and Checkout via truck. On the right, NASA’s Pegasus barge, carrying several pieces of hardware for Artemis II, III, and IV arrives at NASA Kennedy’s Launch Complex 39 turn basin wharf on Thursday, Sept. 5, 2024. Credit: NASA

From across the Atlantic Ocean and through the Gulf of Mexico, two ships converged, delivering key spacecraft and rocket components of NASA’s

This is the hidden content, please
campaign to the agency’s Kennedy Space Center in Florida.

On Sept. 3, ESA (********* Space Agency) marked a milestone in the

This is the hidden content, please
mission as its *********-built service module for NASA’s Orion spacecraft completed a transatlantic journey from Bremen, Germany, to Port Canaveral, Florida, where technicians moved it to nearby NASA Kennedy. Transported aboard the
This is the hidden content, please
cargo ship, the ********* Service Module—assembled by Airbus with components from 10 ********* countries and the U.S.—provides propulsion, thermal control, electrical power, and water and oxygen for its crews.

“Seeing multi-mission hardware arrive at the same time demonstrates the progress we are making on our Artemis missions,” said Amit Kshatriya, deputy associate administrator, Moon to Mars Program, at NASA Headquarters in Washington. “We are going to the Moon together with our industry and international partners and we are manufacturing, assembling, building, and integrating elements for Artemis flights.”

NASA’s

This is the hidden content, please
barge, the agency’s waterway workhorse for transporting large hardware by sea, ferried multi-mission hardware for the agency’s
This is the hidden content, please
(Space Launch System) rocket, the
This is the hidden content, please
launch vehicle stage adapter, the “boat-tail” of the core stage for Artemis III, the core stage engine section for Artemis IV, along with ground support equipment needed to move and assemble the large components. The barge pulled into NASA Kennedy’s Launch Complex 39B Turn Basin Thursday.

The spacecraft factory inside NASA Kennedy’s Neil Armstrong Operations and Checkout Building is set to buzz with additional activity in the coming months. With the Artemis II Orion crew and service modules stacked together and undergoing testing, and engineers outfitting the Artemis III and IV crew modules, engineers soon will connect the newly arrived ********* Service Module to the crew module adapter, which houses electronic equipment for communications, power, and control, and includes an umbilical connector that bridges the electrical, data, and fluid systems between the crew and service modules.

The SLS rocket’s cone-shaped

This is the hidden content, please
connects the core stage to the
This is the hidden content, please
and protects the rocket’s flight computers, avionics, and electrical devices in the upper stage system during launch and ascent. The adapter will be taken to Kennedy’s Vehicle Assembly Building in preparation for Artemis II rocket stacking operations.

The boat-tail, which will be used during the assembly of the SLS core stage for Artemis III, is a fairing-like structure that protects the bottom end of the core stage and

This is the hidden content, please
. This hardware, picked up at NASA’s Michoud Assembly Facility in New Orleans, will join the
This is the hidden content, please
housed in the spaceport’s Space Systems Processing Facility.

The Artemis IV SLS core stage engine section arrived from NASA Michoud and also will transfer to the center’s processing facility ahead of final assembly.

Under the

This is the hidden content, please
campaign, NASA will land the first woman, first person of ******, and its first international partner astronaut on the lunar surface, establishing long-term exploration for scientific discovery and preparing for human missions to Mars. The agency’s SLS rocket and Orion spacecraft, and supporting ground systems, along with the human landing system, next-generation spacesuits and rovers, and Gateway, serve as NASA’s foundation for deep space exploration.

For more information on NASA’s Artemis missions, visit:

This is the hidden content, please

-end-

Rachel Kraft
Headquarters, Washington
202-358-1600
Rachel.h*****@*****.tld

Allison Tankersley, Antonia Jaramillo Botero
Kennedy Space Center, Florida
321-867-2468
Allison.p*****@*****.tld/ *****@*****.tld

This is the hidden content, please

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
  • Vote for the server

    To vote for this server you must login.

    Jim Carrey Flirting GIF

  • Recently Browsing   0 members

    • No registered users viewing this page.

Important Information

Privacy Notice: We utilize cookies to optimize your browsing experience and analyze website traffic. By consenting, you acknowledge and agree to our Cookie Policy, ensuring your privacy preferences are respected.