Diamond Member Pelican Press 0 Posted August 16, 2024 Diamond Member Share Posted August 16, 2024 This is the hidden content, please Sign In or Sign Up Construction problem stalled work on new hilltop hotel in Paso Robles. When will it open? Work on a hilltop hotel development in Paso Robles is moving forward after a brief delay during the winter due to a leaky roof. A new Marriott Residence Inn, a 128-room extended-stay hotel, is being built on Vine Street and Highway 46 West. Construction This is the hidden content, please Sign In or Sign Up . The hotel was originally slated to be completed by 2024, but the project “slowed over the winter due to some roof leaks,” Paso Robles community development director Warren Frace told The Tribune. What is that in SLO County? Ever wonder what that construction is in your town or what happened to that local business? We’re finding out the answers. Send us your questions and tips by emailing reporter Kaytlyn Leslie at *****@*****.tld. • • • Read More • This is the hidden content, please Sign In or Sign Up • This is the hidden content, please Sign In or Sign Up Frace said those leaks were resolved in the spring, however. Since then, work has been moving forward on the project. As of Monday, Frace said work was focused on finishing the exterior stucco and completing interior improvements. data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== Construction is moving forward after a brief winter delay at the Marriott Residence Inn going up off Highway 101 in Paso Robles, seen here on May 27, 2024. The hotel is now slated to open in early 2025. The Residence Inn is expected to include studio, one-bedroom and two-bedroom rooms. Rates for the new hotel haven’t been announced yet, but at the nearby Courtyard Paso Robles — also owned by Marriott — prices range between $176 and $352 a night depending on the size of the room. Meanwhile, the nearest Residence Inn in Goleta charges between $380 and $589 per night, This is the hidden content, please Sign In or Sign Up . data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw==data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///ywAAAAAAQABAAACAUwAOw== Construction is moving forward after a brief winter delay at the Marriott Residence Inn going up off Highway 101 in Paso Robles, seen here on May 27, 2024. This is the hidden content, please Sign In or Sign Up #Construction #problem #stalled #work #hilltop #hotel #Paso #Robles #open This is the hidden content, please Sign In or Sign Up This is the hidden content, please Sign In or Sign Up 0 Quote Link to comment https://hopzone.eu/forums/topic/101233-construction-problem-stalled-work-on-new-hilltop-hotel-in-paso-robles-when-will-it-open/ Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.