Diamond Member Pelican Press 0 Posted April 2 Diamond Member Share Posted April 2 ******** government blames contractor for loose clamps that caused Maya Train derailment MEXICO CITY (AP) — The ******** government blamed a contractor Tuesday for a loose railway fitting that caused a train car to derail on the president’s **** project, a tourist rail route known as the This is the hidden content, please Sign In or Sign Up . The derailment on March 25 proved embarrassing for President Andrés Manuel López Obrador, who views This is the hidden content, please Sign In or Sign Up . No one was injured in the mishap. Critics have said the project, which runs in a loop around the Yucatan peninsula, is wasteful and This is the hidden content, please Sign In or Sign Up . But others have expressed concern about the haste with which it is being built. López Obrador wants to finish it before he leaves office Sept. 30. Illustrating the problem, Defense Secretary Luis Cresencio Sandoval said that the rail switch involved in the accident is eventually designed to be operated automatically. But because the automated system is not yet in place, but the president wanted part of the line running anyway, the switch — which shunts train cars onto another track — has to be manually loosened, moved and returned to its original position by hand. In one of those operations, someone apparently didn’t tighten the fitting down again. Sandoval said “this is what was found, that this clamp wasn’t tightened down.” He said that the company which made the trains, Alstom, and the company that built that stretch of the rail line, Azvindi, “are analyzing and reviewing the amount of damage” done in the mishap. López Obrador ordered the project built through a stretch of jungle, despite warnings from activists about the damage that would do to the sensitive limestone caves on the Yucatan peninsula. The president promised to build an elevated platform for the rail line to avoid crushing the caves, but the concrete and steel pilings to support that were punched right into the caves. In March, activists published photos of those steel and cement pilings This is the hidden content, please Sign In or Sign Up The network of caves, sinkhole lakes and underground rivers along Mexico’s Caribbean coast are both environmentally sensitive and have been found to hold This is the hidden content, please Sign In or Sign Up They provide the region’s only fresh water source, because there are no surface rivers on the flat, limestone peninsula. Because the caves were dry some 10,000 years ago, humans and animals used them before they were mostly flooded at the end of the last Ice Age about 8,000 years ago, essentially preserving the relics from being **********. In December, This is the hidden content, please Sign In or Sign Up to the north and east, between Cancun and the colonial city of Campeche. The 950-mile line runs in a rough loop around the Yucatan peninsula and it’s meant to connect beach resorts and archaeological sites. The train was partly built by the ******** army and will be run by the armed forces, to whom López Obrador has entrusted more projects than any other president in at least a century. ___ Follow AP’s coverage of ****** America and the Caribbean at This is the hidden content, please Sign In or Sign Up Andrés Manuel López Obrador,Luis Cresencio Sandoval,Yucatan peninsula,limestone caves #******** #government #blames #contractor #loose #clamps #caused #Maya #Train #derailment This is the hidden content, please Sign In or Sign Up Link to comment https://hopzone.eu/forums/topic/10032-mexican-government-blames-contractor-for-loose-clamps-that-caused-maya-train-derailment/ Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now